1
/
of
16
mypawbloom
Smart Pet GPS Location Tracker & Adjustable Anti-Lost Collar
Smart Pet GPS Location Tracker & Adjustable Anti-Lost Collar
Regular price
$34.90 USD
Regular price
$0.00 USD
Sale price
$34.90 USD
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
π°οΈ SMART RADAR QUICK SETUP & PAIRING GUIDE
Secure your peace of mind and protect your pet in seconds! Follow these simple steps to power on and sync your real-time locator tag:
- π Install the Battery: Open the secure, lightweight tracker pod casing using the included tool. Insert a fresh CR2032 button battery (not included) flat into the slot and firmly snap the water-resistant casing back together.
- π± Sync with Your Smartphone: Download the compatible smart tracking application from the Apple App Store or Google Play Store. Turn on your phone's Bluetooth, press the tracker button for 3 seconds until it beeps, and tap "Add Device" to pair.
- π Fit the Adjustable Collar: Slide the compact smart tracker pod onto the durable adjustable collar strap. Adjust the slider buckle to achieve a snug, safe fit around your dog or cat's neck, ensuring a comfortable 2-finger space gap.
βοΈ PRODUCT SPECIFICATIONS
- Product Type: Smart Bluetooth Wireless Anti-Lost Pet GPS Tracker & Adjustable Collar Kit
- Tracking Radius: High-efficiency localized real-time radar mapping via smartphone application tracking
- Material Composition: Heavy-Duty, Impact-Resistant ABS Plastic Pod & Soft Nylon Weave Collar
- Hardware Integration: Lightweight structural layout built cleanly to prevent neck fatigue or dynamic slouching
- Battery Requirement: Standard CR2032 Button Battery (Not included β easily replaceable)
- Target Audience: Perfectly sized for Puppies, Small to Medium Dog Breeds, and Indoor/Outdoor Cats
π ADJUSTABLE COLLAR SIZING Guide
| Size Profile | Collar Neck Adjustment Range | Recommended Pet Weight |
|---|---|---|
| Universal Adjustable | Fully customizable slider fits small to medium neck sizes | Best for Pets from 5 lbs up to 35 lbs |
*Sizing Advice: The ultra-lightweight tracker pod design is engineered to sit comfortably without weighing down your pet's neck line. Please measure your pet's neck circumference before purchase to ensure comfort.
β¨ WHY YOU & YOUR PET WILL LOVE IT
- Reliable Anti-Lost Security Shield: Delivers instant tracking metrics right to your smartphone screen, helping you monitor escape-artist indoor cats or adventurous off-leash dogs easily.
- Ultra-Lightweight & Compact Chassis: The tiny radar pod fits subtly onto the adjustable collar strap without restricting your companion's ability to run, play, jump, eat, or nap comfortably.
- Two-Way Sound Alert Function: Can't find your cat hiding inside the house? Simply trigger the audible chime alert within the phone app to make the tracker pod beep, leading you directly to their cozy hiding spot.
- Long-Lasting Replaceable Battery Life: Relies on an ultra-low power consumption configuration, allowing a single common button cell battery to protect your family for months before requiring a quick change.
π COMPLETE THE ON-THE-GO OUTDOOR WALK BUNDLE
Ensure total outdoor safety and smart security on every journey! While this smart tracker monitors your pet's precise locations, keep your dogs completely tangle-free during city walks.
- πΆββοΈ 3-in-1 Dual Head Retractable Leash: A smooth-operating, tangle-free 360Β° rotating double retractable leash equipped with an integrated LED flashlight and a built-in waste bag dispenser capsule. Shop Dual Retractable Leash β
Share
